Photos - Teraco's new data centre being built in Cape Town

"D"

Expert Member
Joined
Oct 20, 2006
Messages
2,216
Construction Industry has resumed work even before Lockdown Level 2 (or Level 1) has been declared?
 

recre8

Senior Member
Joined
Jan 14, 2010
Messages
886
Yep.. looks like the new Richmond industrial area, or the one further down at the sandown road exit to parklands..
BRACKENFELL
Address: 9 Rubicon Boulevard, Brackengate 2, Brackenfell, Cape Town
Telephone: +27 (0) 11 573 2800 or 0860 837 226
Fax: +27 86 680 7227
GPS Co-ordinates: -33.907417, 18.679360
 
  • Like
Reactions: swb

Skerminkel

Expert Member
Joined
Dec 3, 2008
Messages
3,678
Does the 30MW/60MW refer to power consumption? Sounds odd if it does, because I assume that networking and data equipment improves continuously. Or do they simply keep increasing processing capacity at the same power use?
 

paul5186

Expert Member
Joined
May 21, 2007
Messages
1,304
Does the 30MW/60MW refer to power consumption? Sounds odd if it does, because I assume that networking and data equipment improves continuously. Or do they simply keep increasing processing capacity at the same power use?
Usually each cabinet is provisioned with 1KW, however this can increase depending on the number of servers in a cabinet. The client pays per extra KW per month. Usually there are also two municipal power feeds from separate transformers and separate cable routes.

So that 30MW is not the power consumption figures, but they have the ability to draw that amount of power in the future if needs be.
 