We were already 3000MW short for most of the week, strip out an additional 3000MW and they might as well declare this week a national holiday for everyone as no Eskom blackout stages make allowances for that amount it seems.
Safety: Duvha's excellent safety record is proven by the fact that it has been awarded
NOSCAR status twice already by the National Occupational Safety Association (NOSA).
The last award was made in March 2001.
Is Duvha that big then? Gosh!
Safety: Duvha's excellent safety record is proven by the fact that it has been awarded
NOSCAR status twice already by the National Occupational Safety Association (NOSA).
The last award was made in March 2001.
On 8 January 2003, Unit 2 generator explodes while being returned to service after a malfunction.[3] On 9 February 2011 another unit failed catastrophically while performing over speed testing.[4][5] The units are over speed rated at 3600rpm and the last recorded speed before failure was 4250rpm.
The first power station in South Africa to have a black power station manager, Ehud Matya.
That is potentially 3600 MW off the grid if they shut it down and if it was at full capacity.
It will be dark but Sneeky will be drunk
edit: 3000 MW as Duvha has 6x600MW capability.
What are you doing up at 2 to 5 am?Bastards. Brainless ANC!
2am to 5am and now again since 3pm
What are you doing up at 2 to 5 am?
I'm clear on stages 1 and 2.
I have a suspicion that Eskom will go to Stage 3 shortly... and then I throw my toys out of the cot.
Stage 3: 16h00 - 20h30
Sorry, I'm hoping for stage 3 before 18:00 then I'm in the clearI'm clear on stages 1 and 2.
I have a suspicion that Eskom will go to Stage 3 shortly... and then I throw my toys out of the cot.
Stage 3: 16h00 - 20h30
Sorry, I'm hoping for stage 3 before 18:00 then I'm in the clear![]()
3,2,1 - thar she blows - hmm power's still onWe're running out of time…
3,2,1 - thar she blows - hmm power's still on
... OK off now, 2mins late3,2,1 - thar she blows - hmm power's still on