Stage 2 load shedding announced from 11am today till 5am Monday

Lupus

Honorary Master
Joined
Apr 25, 2006
Messages
50,982
I'm trying to utilize all potential angles of the sun, I lose production late afternoon when the one side of my house is pelted with the rays.
Do you have any actual roof left :). For me the first biggest step is to get the council to chop the bloody pines down, they would drop my production down a lot as well.
 

semaphore

Honorary Master
Joined
Nov 13, 2007
Messages
15,206
Do you have any actual roof left :). For me the first biggest step is to get the council to chop the bloody pines down, they would drop my production down a lot as well.
I have one side that can fit 12 panels left.
 

semaphore

Honorary Master
Joined
Nov 13, 2007
Messages
15,206
12 will be just fine. I have 12 x 410w panels. Peak generation is 4300w on a good day. Plenty go power there.
63melr.jpg
 

shearder

Expert Member
Joined
Aug 22, 2007
Messages
1,104
When you use JHB ZOO AND PTA ZOO as an employment agency for government and government departments that's what happens
 

Lupus

Honorary Master
Joined
Apr 25, 2006
Messages
50,982
Just make sure you're not cutting trees outside your property; that could lead to a fine from the city.
I know :-( that is my issue.

Also hearing that quite a few units came back this morning from Eskom sigh.
 

Lupus

Honorary Master
Joined
Apr 25, 2006
Messages
50,982
This is old now; and proven not to be the case. Wish people would stop with this kak.
People won't, they seem to lock on to something and stick with it. Listening to the briefing it's basically things that have been broken for almost a year that still haven't come back.
 

CaptainPugwash

Well-Known Member
Joined
Aug 3, 2018
Messages
165
It's not Power Cut's or Load Sheading. That sounds way too soft for the damage this causes our economy. It's Nationwide Rolling Blackouts!!
 

Lupus

Honorary Master
Joined
Apr 25, 2006
Messages
50,982
It's not Power Cut's or Load Sheading. That sounds way too soft for the damage this causes our economy. It's Nationwide Rolling Blackouts!!
No it's loadshedding... A rolling blackout would be when the system actually goes down. Loadshedding isn't something invented by Eskom, it's an actual term used when you need to make sure the grid doesn't blackout.
A rolling blackout would be as the grid shuts down it rolls through the country and doesn't come back up.
 
Top