This morning our power was off from 02H00-7H00 when it was suppose to be from 02H00 - 4H30.
It would be funny if their power goes off.Eskom his having press conference 10am
Waste of time and money. They're just going to rehash the same waffle they usually do.Eskom his having press conference 10am
Its been what 7 times we had the chance and people still vote for incompetenceJirre. Can we just get the ANC out of govt?
That's quite a lot of tripping.On Sat, a relatively quiet day - Arnold and Duvha units tripped.
On Sun four units tripped, but returned on Monday.
On Monday - eight units tripped. that removed 3300 MW.
Only one unit returned thus far.
Withing 36 hours - total net 4200 MW worth of loss - over and above this.
Fourth unit is still coming onlineOberholzer
From Jan 1 2021 to end April 2021 - 29 days of load shedding
From Jan 1 2022 to end April 2022 - 25 says of load shedding- four less than last year, but it is worrying that there were four days of Stage 4 load shedding.
We have to be ready for demand coming.
All six units of Medupi are in operation. There was an own goal with an explosion at one unit at Medupi.
At Kusile - only 3 of 6 are in commercial operation.
Because of the lack of time with Medupi and Kusile - there were design defects.
@Gaz{M} - thought you might be interested re Kusile. So there is a fair whack of new capacity due to come online due to the extraordinary delays.
Because of the lack of time with Medupi and Kusile - there were design defects.
Lack of time?Oberholzer
From Jan 1 2021 to end April 2021 - 29 days of load shedding
From Jan 1 2022 to end April 2022 - 25 says of load shedding- four less than last year, but it is worrying that there were four days of Stage 4 load shedding.
We have to be ready for demand coming.
All six units of Medupi are in operation. There was an own goal with an explosion at one unit at Medupi.
At Kusile - only 3 of 6 are in commercial operation.
Because of the lack of time with Medupi and Kusile - there were design defects.
@Gaz{M} - thought you might be interested re Kusile. So there is a fair whack of new capacity due to come online due to the extraordinary delays.
Hey did you guys end up with load shedding?Still dealing with a lot of kak here, literally. Sewerage is the next big problem.
Yeah but only 720x2 in the next 2 to 3 years. By then old units will be shut down so it's not a big net gain in new capacity.Oberholzer
From Jan 1 2021 to end April 2021 - 29 days of load shedding
From Jan 1 2022 to end April 2022 - 25 says of load shedding- four less than last year, but it is worrying that there were four days of Stage 4 load shedding.
We have to be ready for demand coming.
All six units of Medupi are in operation. There was an own goal with an explosion at one unit at Medupi.
At Kusile - only 3 of 6 are in commercial operation.
Because of the lack of time with Medupi and Kusile - there were design defects.
@Gaz{M} - thought you might be interested re Kusile. So there is a fair whack of new capacity due to come online due to the extraordinary delays.
They didn't have much time for the design phase and went to construction too soon.Lack of time?
LACK OF TIME?!
What the actual unholy ****.