Warning over ‘stage 10’ load shedding – and what it means for South Africa

ToxicBunny

Oi! Leave me out of this...
Joined
Apr 8, 2006
Messages
113,505
Oh yay.. a new energy expert .. and one who just happens to sell Solar solutions... coinkydink or not I wonder?
 

Pak Fa Fui

Executive Member
Joined
Dec 6, 2021
Messages
7,746
There are limits, 24 hours in a day and x amount of MW
If there is no load to shed then it is zero power which is also a limit
 
Joined
Mar 6, 2004
Messages
41,699
Another rent-a-quote. Does he know Eskom reduces its scheduled maintenance in winter drastically+ Kusile (3 units) + Koeberg Unit 1 should all be supplying power to the grid by July.
 

rh1

Executive Member
Joined
Aug 5, 2011
Messages
7,315
It's like 2020 had all these COVID experts, now we have all these energy experts.
In this age of self identifying as anything. MyBB self identifies as experts of everything.
 

porchrat

Honorary Master
Joined
Sep 11, 2008
Messages
34,278
Initially it was all over the place yes.
Stage 3 was actually 4GW shed
View attachment 1459105

In the early days stage 1 was only up to 300MW but that changed.
HAHA What muppet decided Stage 3 would be 4GW?!?!

That is just insane.

I get 1 stage = 2GW... but 3 = 4GW?

No man.

I don't remember much of this lunacy, but I think this was back when each city was doing its own thing with time slots. What chaos.
 

SlowInternet

Executive Member
Joined
Oct 11, 2006
Messages
8,322
In the end certain people are going to benefit a lot from this power crisis.

Just create a big enough crisis and then some saviours will step in to "save" us all and provide the much needed electricity and make billions.
 

Lupus

Honorary Master
Joined
Apr 25, 2006
Messages
50,979
HAHA What muppet decided Stage 3 would be 4GW?!?!

That is just insane.

I get 1 stage = 2GW... but 3 = 4GW?

No man.

I don't remember much of this lunacy, but I think this was back when each city was doing its own thing with time slots. What chaos.
The screen shot is right there from Dec 2014, Eskom did split stage 3 into 3a and 3b, shortly after that it 3b became 4.
 

supersunbird

Honorary Master
Joined
Oct 1, 2005
Messages
60,142
Stage 10 on loadshedding schedules will be up to 16 to 17 hours a day without power, while Stage 12 it will be 16 to 17 hours a day without power.*

*excluding system failures
 

RedViking

Nord of the South
Joined
Feb 23, 2012
Messages
58,154
Im not really sure what we supposed to do with all these warnings. Currently have a drawer full of warnings, should I file this one as wel or does it go up against the fridge?
 

rvZA

Honorary Master
Joined
Jan 3, 2021
Messages
16,594
These guys are playing with small change the fu**nuts... Let's hit loadshedding stage 16,957,787 then it will be newsworthy.
 
Top