{"id":461112,"date":"2022-09-19T14:25:00","date_gmt":"2022-09-19T12:25:00","guid":{"rendered":"https:\/\/mybroadband.co.za\/news\/?p=461112"},"modified":"2022-09-19T17:08:53","modified_gmt":"2022-09-19T15:08:53","slug":"eskom-to-reduce-load-shedding","status":"publish","type":"post","link":"https:\/\/mybroadband.co.za\/news\/energy\/461112-eskom-to-reduce-load-shedding.html","title":{"rendered":"Eskom to reduce load-shedding"},"content":{"rendered":"<p>Eskom will reduce load-shedding to stage 5 from Tuesday after restoring several generating units at its coal-fired power stations to service over Sunday night.<\/p>\n<p>&#8220;We returned a unit each at Camden, Kriel, Kusile and Kendal,&#8221; the utility said in a short statement to the media on Monday afternoon.<\/p>\n<p>However, it also had to take one unit at Duvha Power Station off the grid due to a boiler tube leak.<\/p>\n<p>&#8220;This means we will be able to reduce load-shedding to stage 5 at midnight,&#8221; Eskom said.<\/p>\n<p>At the time of publication, planned outages were at 5,411MW and breakdowns amounted to 16,326MW.<\/p>\n<p>Notably, the latter was higher than on Sunday, when Eskom was forced to implement stage 6 load-shedding.<\/p>\n<p>Eskom said that further updates on load-shedding would be announced &#8220;as soon as possible&#8221;.<\/p>\n<h3 class=\"my-4\">No firm outlook<\/h3>\n<p>In a media briefing on Sunday, the <a href=\"https:\/\/mybroadband.co.za\/news\/energy\/460996-bad-news-for-stage-6-load-shedding.html\" target=\"_blank\" rel=\"noopener\"><strong>utility&#8217;s COO Jan Oberholzer said<\/strong><\/a> the state of the system made it difficult to provide a firm outlook on the load-shedding stages that would be required in the coming week.<\/p>\n<p>Aside from numerous unit breakdowns last week, Eskom had made extensive use of its emergency generating capacity, including pumped-storage dams and open-cycle gas turbines, to get the country through peak demand periods.<\/p>\n<p>As a result, the water levels and diesel reserves at these facilities had run low.<\/p>\n<p>Oberholzer said Eskom anticipated it could return the water levels to an adequate capacity by Monday evening, but diesel volumes were only expected to be recovered later in the week.<\/p>\n<p>Because it cannot continue relying heavily on the roughly 6,000MW of capacity that these systems provide, a high level of load-shedding continues to be required.<\/p>\n<p>Meanwhile, the load-shedding situation cut short President Cyril Ramaphosa&#8217;s latest overseas trip, following a virtual meeting with his cabinet ministers and officials.<\/p>\n<p>Ramaphosa will fly back to South Africa to &#8220;deal&#8221; with the power crisis after attending Queen Elizabeth II&#8217;s funeral on Monday, cancelling plans to address the United Nations General Assembly in New York later in the week.<\/p>\n<h3 class=\"my-4\">Now read: <a href=\"https:\/\/mybroadband.co.za\/news\/energy\/460896-eskom-2-0-total-insanity.html\" rel=\"bookmark\">Eskom 2.0 \u201cTotal Insanity\u201d<\/a><\/h3>\n","protected":false},"excerpt":{"rendered":"<p>Eskom managed to restore several generating units to service on Sunday night, allowing for load-shedding to be reduced from stage 6 from Tuesday morning. <\/p>\n","protected":false},"author":23,"featured_media":441748,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27995],"tags":[181,35,51867,81460,79422],"class_list":["post-461112","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-eskom","tag-headline","tag-loadshedding","tag-stage-5-load-shedding","tag-stage-6-load-shedding"],"_links":{"self":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/461112"}],"collection":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/comments?post=461112"}],"version-history":[{"count":1,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/461112\/revisions"}],"predecessor-version":[{"id":461114,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/461112\/revisions\/461114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/media\/441748"}],"wp:attachment":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/media?parent=461112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/categories?post=461112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/tags?post=461112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}