{"id":606282,"date":"2025-08-12T09:28:18","date_gmt":"2025-08-12T07:28:18","guid":{"rendered":"https:\/\/mybroadband.co.za\/news\/?p=606282"},"modified":"2025-08-12T11:42:53","modified_gmt":"2025-08-12T09:42:53","slug":"teraco-completes-africas-largest-standalone-data-centre-in-johannesburg","status":"publish","type":"post","link":"https:\/\/mybroadband.co.za\/news\/cloud-hosting\/606282-teraco-completes-africas-largest-standalone-data-centre-in-johannesburg.html","title":{"rendered":"Inside Teraco&#8217;s new hyperscale data centre"},"content":{"rendered":"\n<p>Teraco has announced the completion of its JB4 Bredell Campus data centre in the East of Johannesburg. The facility is capable of servicing 50MW of critical IT power load.<\/p>\n\n\n\n<p>According to the company, the latest 30MW expansion phase at the data centre resulted in JB4 becoming Africa&#8217;s largest standalone data centre.<\/p>\n\n\n\n<p>The new phase comprises six data halls and includes numerous design enhancements. The new halls each support 5MW of allocated critical IT load \u2014 another first for Africa.<\/p>\n\n\n\n<p>The data halls are fully liquid-to-liquid cooled, allowing clients to deploy high-density, air-cooled cloud deployments and direct-to-chip cooling for denser artificial intelligence (AI) workloads.<\/p>\n\n\n\n<p>JB4 comprises an 80,000m2 building structure serviced by an 80MW utility power supply. The total facility comprises 14 data halls, totalling 17,000m<sup>2<\/sup>.<\/p>\n\n\n\n<p>According to Teraco, the facility is built in line with global hyperscale requirements and international compliance standards.<\/p>\n\n\n\n<p>&#8220;JB4 has been designed with sustainability at its core, incorporating a state-of-the-art closed-loop chilled water system that provides free air cooling,&#8221; says Teraco.<\/p>\n\n\n\n<p>The facility also uses AI-enabled technology to configure hall cooling in real-time, based on IT load and load dispersion.<\/p>\n\n\n\n<p>&#8220;This innovative design achieves industry-leading Power Usage Effectiveness (PUE), significantly reducing energy consumption while using zero water during ongoing cooling,&#8221; says Teraco.<\/p>\n\n\n\n<p>It highlighted that using zero water during cooling, thanks to the closed-loop system, is an important feature considering water scarcity and supply reliability.<\/p>\n\n\n\n<p>&#8220;The JB4 expansion, built to stringent global hyperscale specifications, contributed significantly to the South African and sub-Saharan African data centre footprint,&#8221; said Teraco.<\/p>\n\n\n\n<p>&#8220;This follows the recent completion of Teraco&#8217;s new hyperscale JB5 Isando facility, which adds another 30MW of critical IT power to Teraco&#8217;s Isando Campus in Ekurhuleni.&#8221;<\/p>\n\n\n\n<p>Teraco CEO Jan Hnizdo said the company was well-positioned to continue on its growth trajectory, thanks to sustained demand from enterprises and hyperscale clients for hybrid cloud and cloud deployments.<\/p>\n\n\n\n<p>&#8220;South Africa has become the technology and data centre hub for sub-Saharan Africa, acting as a springboard for cloud, AI, and content provision into Africa,&#8221; he said.<\/p>\n\n\n\n<p>&#8220;Massive global investments in undersea cables, such as Equiano and 2Africa, further strengthen this position.&#8221;<\/p>\n\n\n\n<p>He added that these investments will enable global cloud providers to service the South African market and the rest of the sub-Saharan African region.<\/p>\n\n\n\n<p>&#8220;Teraco is dedicated to expanding its capacity across key hubs, ensuring our clients have the flexibility to scale and fully leverage digital transformation across the region,&#8221; says Hnizdo.<\/p>\n\n\n\n<p>&#8220;We continue to make significant investments in ICT infrastructure and have established Africa&#8217;s largest data centre platform.&#8221;<\/p>\n\n\n\n<p>Combined, Teraco&#8217;s growing data centre platform comprises 189MW of critical power load across the Isando, Bredell, Cape Town, and Durban campuses.<\/p>\n\n\n\n<p>Below are photographs of Teraco&#8217;s completed JB4 data centre at its Bredell Campus in Ekurhuleni.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"514\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21-1200x514.jpg\" alt=\"\" class=\"wp-image-606289\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21-1200x514.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21-600x257.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21-768x329.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21-1536x658.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-21.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"514\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10-1200x514.jpg\" alt=\"\" class=\"wp-image-606287\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10-1200x514.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10-600x257.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10-768x329.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10-1536x658.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-10.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"514\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4-1200x514.jpg\" alt=\"\" class=\"wp-image-606290\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4-1200x514.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4-600x257.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4-768x329.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4-1536x658.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-exterior-4.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1-1200x800.jpg\" alt=\"\" class=\"wp-image-606291\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1-1200x800.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1-600x400.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1-768x512.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1-1536x1024.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-reception-area-1.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2-1200x800.jpg\" alt=\"\" class=\"wp-image-606286\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2-1200x800.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2-600x400.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2-768x512.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2-1536x1024.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-energy-center-room-2.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40-1200x600.jpg\" alt=\"\" class=\"wp-image-606284\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40-1200x600.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40-600x300.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40-768x384.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40-1536x768.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-40.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5-1200x600.jpg\" alt=\"\" class=\"wp-image-606285\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5-1200x600.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5-600x300.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5-768x384.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5-1536x768.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-5.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10-1200x600.jpg\" alt=\"\" class=\"wp-image-606292\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10-1200x600.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10-600x300.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10-768x384.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10-1536x768.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-10.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-image size-large\"><a  data-lightbox=\"post-image\" href=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"600\" src=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2-1200x600.jpg\" alt=\"\" class=\"wp-image-606293\" srcset=\"https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2-1200x600.jpg 1200w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2-600x300.jpg 600w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2-768x384.jpg 768w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2-1536x768.jpg 1536w, https:\/\/mybroadband.co.za\/news\/wp-content\/uploads\/2025\/08\/teraco-jb4-data-centre-rooftop-plant-equipment-2.jpg 2000w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n","protected":false},"excerpt":{"rendered":"<p>Teraco has completed its 30MW expansion phase at its JB4 data centre, bringing the total serviceable IT load to 50MW.<\/p>\n","protected":false},"author":341076,"featured_media":606283,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[29400,100967,441,99083],"class_list":["post-606282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cloud-hosting","tag-jan-hnizdo","tag-jb4","tag-teraco","tag-teraco-bredell-campus"],"_links":{"self":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/606282"}],"collection":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/users\/341076"}],"replies":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/comments?post=606282"}],"version-history":[{"count":5,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/606282\/revisions"}],"predecessor-version":[{"id":606339,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/posts\/606282\/revisions\/606339"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/media\/606283"}],"wp:attachment":[{"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/media?parent=606282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/categories?post=606282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mybroadband.co.za\/news\/wp-json\/wp\/v2\/tags?post=606282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}