Recent content by ciscoyeti

  1. C

    Looking for photos / testimony of a Complex Install

    Metrofirbe Networkx is installing Fibre in our complex, they have connected the fibre to my unit. They just ran the fibre where the telkom line comes in, the little box sits below the telkom one. Then end of the month when network is live they will come and finish and I'll be up and running.
  2. C

    Time from estate contract signing to live

    My estate is around 310 houses and they are estimating 12 weeks before people are able to get connected and start using the service.
  3. C

    Heatbox Solar Geyser

    A fully installed 300L kwikot Indirect solar geyser with flat plate collectors will set you back around R34 000 inc VAT at insurance rates. You could also just retrofit an existing electric geyser with EVT tubes for around R14 000 inc VAT.
  4. C

    Greencom

    Metrofibre-Networkx will be installing fibre in Lonehill Village Estate starting beginning of next year and should be connecting people in April. I can't wait until it is all up and running.
  5. C

    Flat Panel or Evacuated Tubes

    When you retrofit a normal electric geyser you should always go with EVT tubes, flat plates will run a high risk of bursting during winter and when they do your insurance will give you two options either upgrade to tubes or install another flat plate and they will no longer cover it.
  6. C

    is the solar rebate still on.

    Department of Energy is supposed to start offering rebates again but nobody can say when that will be or if it is actually going to happen.
  7. C

    Will there or won’t there be winter load shedding?

    Everyone I've spoken to who would have a good idea of what is coming says winter will be terrible in regards to load shedding. Not looking forward to it.
  8. C

    Secret Eskom total blackout exercise

    Load shedding is going to be awful this winter, probably a daily occurrence.
  9. C

    Planning your own Solar Power System

    What to do when you live in a complex and they don't allow solar panels, generators and such. I like the goalzero solar generator/battery thing they sell. I could just leave it plugged it and use it as a battery backup for small stuff but not sure where to get it or something similar in Gauteng.
  10. C

    Solar Kits

    For a 300L I would budget for 25K after rebate but try for around 22K or less.
  11. C

    Retrofit 2x 150L Kwikhot Geysers

    It would be an OK system for now but come 3+ years and it will likely give you endless hassle. Seriously think about eventually going for a Kwikot 300L Indirect Closed Couple system. Save up and then by the time you are ready hopefully this rebate thing will be sorted out with the department...
  12. C

    Solar geyser warranty problem - Advised needed

    Where are you located? What is the make of the solar geyser? If it is under warranty the manufacturer must come out and sort it out for you.
  13. C

    Buying a UPS

    I think a power surge damaged the part that handles deciding when to charge the battery and when not to on my laptop. It was making popping noises and never charging the battery, now I just run it without a battery but connected to a UPS because any spike or drop in voltage will shut the laptop...
  14. C

    Official Crystal Web ADSL performance feedback thread Part 2...

    Slow connection problem. http://n1.netalyzr.icsi.berkeley.edu/summary/id=43ca253f-9838-30753aa3-528c-405b-8898 That's a link to one of the tests support asked me to do, it didn't load while we were chatting but I managed to get it to complete after the third attempt. Does anyone know what...
  15. C

    VDSL and ADSL2+

    I'm with Mweb 40Mbps VDSL and for the past few days the speed has dropped from about 38Mbps to around 6 Mbps. I thought maybe the 512k router bug could be the issue but it isn't getting back to normal. Who should I start complaining with, Mweb or Telkom? Is there a way to test a different...
Top
Sign up to the MyBroadband newsletter
X