That was a PPA for only 100MW more. That will probably be enough for a few zones under COJ.. It's still not going to solve old infrastructure issues like when substation trips seconds after load shedding due to isolators or phase burning out.
The generator purging systems at Eskoms power stations are manually operated. The procedure is documented by the H2 forum from Eskoms Center of Excellence so the only indication that they have when purging is gas purity analyzers within the H2 and degassing plant. Another operator error not to...
@Emjay Have a look at Magnadoor burglar bar products. May cost a little more but looks dam sleek. Got them to do my burglar bars and it's solid.. only way to get those bars off would be to break the wall!
I've been getting stable 200+ Mbps since I got the Rain 5G in May last year but since a week ago,speed has been hovering around 40Mbps. What could cause this? I've tried resetting the router numerous times but nothing seems to be working. Rain support guys are just no help.. **sigh**
So approximately how long would 2X 100AH LiFePo4 batteries (in series) last if my house power draw is say 1000W and I'm using a Growatt 3Kw 24V inverter? Cannot seem to find a calculator.. *sigh
My thought exactly.. Something about the pricing sounds dodge.
Thinking of just going the Growatt 3kw 24V inverter with 2X 12V 100AH LiFePo4 batteries in series for now. Will also have the advantage of adding in PV panels at a later stage. I only require +/-800W for lights, TV, modems, PC etc so...
Hi All, i received this quote:
5KW Hybrid Inverter
4X 300W Solar Panels
4X 200AH Gel Batteries
8mX 25mm Battery Cable
40mX 4mm Solar PV Cable
10X Lug Connectors
15mX DB Cable
1X Automatic Change over Switch
12X Clamps
Trunking (As required)
Surge Arrestor
63A Breaker
160A Battery Fuse
R41...
Evening all, not sure if this is the correct forum.
I have been experiencing freezing and Pixelation on certain DSTV Channels. Anyone had this problem before?