I initially thought Cancellations had to take place before the 20th within the same month? I'm reading now that it's a full Calendar month in advance? That's a bit awkward.
I'm currently in the process of moving at the end of the month, however, due to a lengthy process as bonds are, I've only been made aware that everything will be wrapped up within the month as of this week.
I'm still sticking with Cool Ideas and Metrofibre, but this timing, cancellation, and relocation is putting me in a strange position.
Aside from the whole notice bit, what is the difference in turnaround time if a line has to be installed compared to if one is already installed? I'm trying to line everything up to a point with minimal turnaround time