geysers

  1. Hanno Labuschagne

    Joburg getting load reduction, load limiting, and geyser switch-offs despite no load-shedding

    Joburg getting load reduction, load limiting, and geyser switch-offs despite no load-shedding Johannesburg's City Power will start implementing load reduction in areas with "concerning" electricity usage levels that could overload equipment. The power utility has also threatened to switch off...
  2. Hanno Labuschagne

    Study shows AI-controlled geysers could reduce load-shedding by 20 hours per month

    Study shows AI-controlled geysers could reduce load-shedding by 20 hours per month South African cities could reduce the electricity outages hobbling its economy by installing water heaters (geysers) powered by artificial intelligence, a 30-month study has shown. Installing devices that...
  3. Hanno Labuschagne

    How geyser controllers could cut 3-5 stages of load-shedding

    How geyser controllers could cut 3-5 stages of load-shedding South Africa could be spared from up to five stages of load-shedding if all households installed small geyser controllers that switch these power-hungry appliances off during high-demand periods. That is according to the analysis of...
  4. Hanno Labuschagne

    Switching off South Africa's geysers could save up to four stages of load-shedding — Ramokgopa

    Switching off South Africa's geysers could save up to four stages of load-shedding — Ramokgopa Minister in the Presidency responsible for Electricity, Dr Kgosientsho Ramokgopa, is expected to visit the Matimba and Medupi Power Stations in Limpopo on Monday. This is a continuation of the...
Top
Sign up to the MyBroadband newsletter