Good evening all,
After a recent water outage we have decided to pull the trigger on a municipal tied backup water system.
Goal is 3X 2500l + 1.1kw VSD Motor.
The below is a diagram of the space we are working with.
At the moment without pipes connecting tanks etc there is a 70cm pathway this is acceptable. Now my question is is it possible to drill new connection holes?
I dont think they have a hole straight through.
Is the below orientation possible? Can you add additional bulkhead I think thats what its called to connect it like it is in red below so it does not impede the pathway?

After a recent water outage we have decided to pull the trigger on a municipal tied backup water system.
Goal is 3X 2500l + 1.1kw VSD Motor.
The below is a diagram of the space we are working with.
At the moment without pipes connecting tanks etc there is a 70cm pathway this is acceptable. Now my question is is it possible to drill new connection holes?
I dont think they have a hole straight through.
Is the below orientation possible? Can you add additional bulkhead I think thats what its called to connect it like it is in red below so it does not impede the pathway?