Good evening all,

After a recent water outage we have decided to pull the trigger on a municipal tied backup water system.

Goal is 3X 2500l + 1.1kw VSD Motor.

The below is a diagram of the space we are working with.

At the moment without pipes connecting tanks etc there is a 70cm pathway this is acceptable. Now my question is is it possible to drill new connection holes?

I dont think they have a hole straight through.

Is the below orientation possible? Can you add additional bulkhead I think thats what its called to connect it like it is in red below so it does not impede the pathway?



1795716941474.png
 
Thanks, now is it possible to have new holes drilled so it faces inward? and not on pathway?

I wouldn't. You will have to empty all the tanks if you ever need to work on those connections.

Maybe a different type of tank will work better?
Something like this?