SlimJim
Active Member
is there anybody that can explain to me how its possible that its going to take telkom 3 months to install a new dslam in my local exchange?
its not like i live out in the sticks, observatory cape town.
i am aware there's a huge backlog on telkom's side, but 3 months is a far cry from the 6-8 weeks is was told.
maybe i'm missing something?
its not like i live out in the sticks, observatory cape town.
i am aware there's a huge backlog on telkom's side, but 3 months is a far cry from the 6-8 weeks is was told.
maybe i'm missing something?