I am using a LG RD-JT90 projector in a rented lecture hall to present courses. The projector is mounted 50 cm below the ceiling. Aircon is always on. Usually after 1 hour projection it switches off, can be revived again after 10 minutes wait, lasts half an hour, cuts out, etc etc. My courses last 5 hours, so things do not work out.
Obviously the projector is overheating. It looks quite clean inside: no fluff blocking the air vents. The resident technician claims that the projector is not designed for such continuous use and I must supply my own projector, which I prefer not to do if I can help it. CAN HE BE RIGHT?? Is there something else to look for in the projector? A good technician in Pretroia to inspect it?
Thanks
Obviously the projector is overheating. It looks quite clean inside: no fluff blocking the air vents. The resident technician claims that the projector is not designed for such continuous use and I must supply my own projector, which I prefer not to do if I can help it. CAN HE BE RIGHT?? Is there something else to look for in the projector? A good technician in Pretroia to inspect it?
Thanks