fixedESKOM LIVE | Load shedding escalates asrepairs to 10 generating units delayed ...Jo'burg gets a bit nippy
It's not nippyfixed
Meh as long as we stay at stage 4 during the day, I'm fine. My 4 hour slots are in the morning and afternoon this week, only 4 hour evening slot is tonight![]()
ESKOM UPDATES | Load shedding remains suspended | Business
All the latest news and analysis on load shedding, power and the national grid.www.news24.com
Don't forget if it's stage 4 at 2 you'll probably be stage 5 or 6 from 4 to 6Meh as long as we stay at stage 4 during the day, I'm fine. My 4 hour slots are in the morning and afternoon this week, only 4 hour evening slot is tonightTho that is assuming power gets restored on time.......................................................................................
What area is this? West Rand seems to have the most troubleTho that is assuming power gets restored on time.......................................................................................
Oh yeah me too. Set it to 10 seconds. That’s as much as I am willing to budge.Did my bit for sh1ts and giggles. Added a 10min delay to my grid charge (if required) after mains come back on
Nowhere near there, very centralWhat area is this? West Rand seems to have the most trouble
Wow... that's a very low number. Holding off on maintenance to try make it through winter I see.Breakdowns stand at 18 751MW of capacity, while planned maintenance is at 2 407MW.
Their plan was high maintenance in summer and low in winterWow... that's a very low number. Holding off on maintenance to try make it through winter I see.
Yea but there's low maintenance... and then there's that. That's nearly 1/3 of what it usually is.Their plan was high maintenance in summer and low in winter
Mm no, its about 1/2. Planned is usually around, or just under, 5MW. Also a lot of that planned probably just went into unplanned after it broke when it came up xDYea but there's low maintenance... and then there's that. That's nearly 1/3 of what it usually is.
They should just stop maintenance over the winter period.Yea but there's low maintenance... and then there's that. That's nearly 1/3 of what it usually is.
It's mostly planned like that.Wow... that's a very low number. Holding off on maintenance to try make it through winter I see.
It's already considered impossible to catch up by expertsThey should just stop maintenance over the winter period.
They can not, it will degrade systems further, and cause more actual breakdowns.They should just stop maintenance over the winter period.