Hi there folks
So I've been following this thread jealously since the start.
Howdy
p[ay3r ! Welcome.
Our complex has copper telephone wiring coming from the ground up at a wall in my yard which then goes through the wall to the inside where the telephone 'socket' is. Usually the fibre would already be there, ready to be pulled through, but Huawei's guys did not push the fibre through to the houses as yet.
After a visit to the manhole and the box in my neighbour's yard they discovered that the current infrastructure loops the copper through the boxes at each house, so basically there is 1x big plastic tube with the copper cables of about 5 - 7 houses which then loops from house to house in every 'section' of the complex.
Looking at your pics, I presume the conduit is coming from a distant manhole, into a plastic box on your outside wall, just below the level of the black plastic damp-proof course (DPC). Questions :
- I assume there's another conduit that goes from the back of this box, through the wall, and then up into the bottom of the inside box, which would be at a level above the floor (ie above the DPC). Correct ?
- That being the case, it looks like the "loop-through" conduit to the next house in the chain is taken from the inside box, not the outside one. Correct ?
- Judging from the pics, the incoming conduit "big plastic tube" looks like 25mm, not 22. Correct ?
I assume the complex developers decided to run one multi-pair cable to provide copper fixed-line services to between 5 and 7 houses. It looks they're splitting off one pair to serve each house.
That makes perfect sense for copper fixed-line services ... not so much for fibre services.
So they said that they will in essence have to knock at every house from mine until the manhole (5 houses) in order to loop the fibre back into the ground to go off to the next house.
^This.
To be able to provide fibre, Telkom would need to run one individual fibre (or possibly one multi-fibre cable) from the manhole to each of the 5-7 houses served. At each house they would then need to terminate a fibre to provide data (and potentially voice) services to that household. To do this on its own (fibre only, no copper) is probably very feasible. Even doing it with 5-7 individual drop cables is probably quite do-able, given that each such drop cable has approx 3mm OD and the conduit is 25mm (I think). However the problem is going to be those houses that still want copper fixed-line services - it would be very difficult (read : near-impossible) to pull fibre drop cables through together with that old multi-pair copper cable, even if Telkom took the approach of pulling out the old cable first and then pulling it back in together with fibre.
As I see it, to be able make use of the existing ducting (conduit) infrastructure, as opposed to re-trenching and laying new ducts, you or your BC would probably have to get each of the 5-7 houses in a "chain" to agree to toss copper fixed-line services in favour of fibre fixed-line services. Whether that's viable or not depends on the households involved. If they are all net-savvy with existing DSL (or LTE) internet connections, then getting them to go fibre - with or without fibre-based fixed-line voice services - should be a fairly easy sell. If they did want voice services, their same landline number could be ported across to fibre.
The hassle would be deciding on whether or not to cater for those households - present or future - that might still want copper-based fixed-line services.
I am 99% sure that the body corp won't spend on getting infrastructure down for a couple of us wanting fibre, but the copper here is so bad that the complex is less than 1km from the exchange and I can only get 2mbps ADSL.
As I see it, if your Body Corporate wants to avoid re-trenching for fibre, you might have better luck getting the BC to approach Telkom on behalf of the whole complex to change all their copper fixed-line services to fibre, using the existing ducting. Note that I'm assuming aerial distribution is not an option (?).
That's not an easy task, but it would probably be a good investment in the complex's future.
Given that Telkom is actively trying to convert existing DSL subscribers to FTTH in areas where the infrastructure exists (free trials), this might not be as daunting as it sounds.
It rather depends on the make-up of the residents as to whether that idea will fly or not.
Has anybody experienced anything like this or know what will happen going forward?
I've dropped
a post into the
Mooikloof Ridge thread as some of the guys there have recent experience of "housing complex" style installations where the same issue may have cropped up.
Good luck!