Defective Solar System Installation

Then use grid to charge before it gets dark or leave it on 30% until the next day like mine. I already showed him my settings.
Oh not my side ;-) almost 10kWh of panels has made me limp along to around 75% which with low usage will last till tomorrow.
 
Just in time as the heat pump kicked in
 
Great summary!
Billing cycle - correct, bill alternates around 6-8 monthly (6-5/ 7-6/ or 8-7 - hope that makes sense).
Solar app can be configured but not the best - however it gives you a good sense to make an informed decision.

CT Clamp and installing inverter after meter etc - that's standard technical stuff the Service provider should have dealt with. It seems this may not have been adequately addressed during first installation.
Billing cycle get a spreadsheet and work day by day from the app and then you get the total to match up with your complex billing cycle
CT clamp - simple test on the ct clamp check on the inverter screen the load go switch on the geyser / stove etc whatever is not on the inverter and then check does your consumption go up a lot if it doesn't CT clamp isn't right.

Im not saying use the app as besides the 2 minute delay you using solar man it doesn't differentiate the loads - if you use deye cloud you can actually see the load differentiation
 