MartinGB
MyBroadband Staff
- Joined
- Jan 31, 2020
- Messages
- 409
- Reaction score
- 639
Eskom recently announced stage 6 load-shedding, with stage 7 not far off. Do you have a solar installation, batteries or a generator as a backup to Eskom power?
South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
Eskom recently announced stage 6 load-shedding, with stage 7 not far off. Do you have a solar installation, batteries or a generator as a backup to Eskom power?
The delay in downtime [Koeberg maintenance] comes after energy analyst Ted Blom warned that load-shedding would increase from stage 6 to stage 7 should Eskom proceed with the planned outage and not bring other generation back online.
Other, they are too expensiveEskom recently announced stage 6 load-shedding, with stage 7 not far off. Do you have a solar installation, batteries or a generator as a backup to Eskom power?

UPS backups.Eskom recently announced stage 6 load-shedding, with stage 7 not far off. Do you have a solar installation, batteries or a generator as a backup to Eskom power?
Its only a pleasure to help. I want pics after you connect everything lolGot my Hubbles, inverter on the way! Nightmare is soon over. Thanks @DuracellBunny
also goes vroom vroomNope.
Awaiting delivery of a 64kwh battery that can supply some 240V in a pinch.