Great we just had two hours out at 2, now another two. Wish the morons in charge would sincerely die of any, and/or every disease.
During stage one blackouts 1000MW of the national load is cut, 2000MW during stage two, and 4000MW in stage three.
So let met get this straight:
During stage one blackouts 1000MW of the national load is cut, 2000MW during stage two, and 4000MW in stage three.
Is this correct?
Yes.
Before end of last year it was stage 1 = 1000MW , stage 2 = 2000MW and stage 3 = 3000MW but they then changed it.
Area?The lights are still on!!
My area's loadshedding was supposed to start at 10 pm.
stage two rolling power cuts from 6pm to 10pm on Wednesday
Bastards got meGet home from work, sit down to relax and everything switches off. Sigh.