I cannot alter the DB box, so what I want to do is have some kind of inverter plugged into the wall in the study and then the PC runs off that in order for a seamless switch from AC to battery in case of load shedding.
The PC pulls 85 watts at the wall at peak usage.
Does such an invertor exist?
I'd like to make it a bit more "professional" & automated, I do not want to plug stuff in and out every time Eskom cuts the power.
I would then contain this to the study (the PC & fiber and internet is all here on the same plug)
The PC pulls 85 watts at the wall at peak usage.
Does such an invertor exist?
I'd like to make it a bit more "professional" & automated, I do not want to plug stuff in and out every time Eskom cuts the power.
I would then contain this to the study (the PC & fiber and internet is all here on the same plug)