Or the river. Or the treatment plants that put water into the taps. And by extension if the taps are schit, everywhere is schit...
0.0000000000001% of the kzn population goes to the river for fun. Treatment plants are to clean the sewerage into grey water before it flows into the river, got nothing to do with tap water. We don't have a tap water quality problem.
 
Evening Peak Friday, 31/03/2023 (18:14)

Load shedding:
3748 MW

Total Demand:
29 882 MW.
Eskom Available Generation:
25 326 MW
Number of OCGTs GTs Utilised: 17

Renewable Generation: 1651 MW (Wind 1289 MW, CSP 317 MW, PV 45 MW)

IPP Availability:
1014 MW

Fun times ahead!
 
Evening Peak Friday, 31/03/2023 (18:14)

Load shedding:
3748 MW

Total Demand:
29 882 MW.
Eskom Available Generation:
25 326 MW
Number of OCGTs GTs Utilised: 17

Renewable Generation: 1651 MW (Wind 1289 MW, CSP 317 MW, PV 45 MW)

IPP Availability:
1014 MW

Fun times ahead!
Where's this from now?
 
Evening Peak Friday, 31/03/2023 (18:14)

Load shedding:
3748 MW

Total Demand:
29 882 MW.
Eskom Available Generation:
25 326 MW
Number of OCGTs GTs Utilised: 17

Renewable Generation: 1651 MW (Wind 1289 MW, CSP 317 MW, PV 45 MW)

IPP Availability:
1014 MW

Fun times ahead!
I'm not worried. City Power decided we didn't need power the whole of yesterday. So I'm back to being able to cope with stage 4 and beyond.
 