However, energy demand in the country has been growing at a much faster rate than can be supplied.

This has necessitated a development of the country’s energy pool and capacity, and if the early estimates of the recent Brulpadda and Luiperd discoveries are accurate, the gas produced from Brulpadda and Luiperd would be sufficient to meet more than half of the country’s current energy demands.
 
FRIDAY: Stage 2 from 5am-midnight.
SAT&SUN: Stage 2 from 4pm-midnight.
 
Evening Peak Feedback: 08/08/2022, 18:24
Total Demand: 30 108MW
Interruptible Load Supply: 447MW
Virtual Power Station: 96MW
Eskom OCGT’s utilised: 10
IPP OCGT’s: 2
Renewable Gen: 865MW (Wind 503MW, CSP 362MW)
@Eskom_SA
Available Generation Capacity: 30 369MW
 
Feedback from Evening peak: 09/08/2022, 18:38
Total Demand: 29 896MW
Eskom OCGT’s utilised: 11
IPP OCGT’s utilised: 3
Renewable Generation: 661MW (Wind 299MW, CSP 362MW)
@Eskom_SA
Available Generation Capacity: 31 030MW
@EskomSpokesper1
 
High risk of load-shedding.
:unsure:
Mydorpie.com have been right before, but I think sometimes they just say that to cover their asss.

Won't be posting more.
 
:unsure:
Mydorpie.com have been right before, but I think sometimes they just say that to cover their asss.

Won't be posting more.
You mean like Ted Bloom?
Looks unit 2 of Koeberg is slowly ramping up, Monday just over 1GW from Nuclear. Normally 800 to 900MW
 