RunningFromFat
Executive Member
**** the new update , was only meant to have @ 8-10 now it's 4-6 and supper is ****ED. Lmao
South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
Your faith is strong! Stage 4 has been granted at your request.I hope we get an announcement from Eskom today, I have a 4-hour slot for stage 5 tonight and I know they can reduce it to stage 4 - I believe in them
Ja Dankie, all we needed was faith guys, we were the ones dragging on with load-shedding this whole timeYour faith is strong! Stage 4 has been granted at your request.
P.S. Idiot, you should've asked for a lower stage!
Durban only cares about stage 3.Your faith is strong! Stage 4 has been granted at your request.
P.S. Idiot, you should've asked for a lower stage!

www.eskom.co.za
Can you prayer for Stage 2 soon please? (Besides on the Sunday)Ja Dankie, all we needed was faith guys, we were the ones dragging on with load-shedding this whole time
You're lucky block 11 here in JHB is exactly the sameWoohoo!!! Stage 3/4! what am I gonna do with all that electricity??!! I know, tonight I'll treat myself and switch on the bathroom light, So I can see the loo and not just guess
Theft and vadalism through load shedding....When the power goes off...who knows if it will come back on again every time...Not us ...
![]()
Yea tomorrow I don't change at all either. Hooray.You're lucky block 11 here in JHB is exactly the same
I used to live in an area in PTA that never got load shedding....And then decided, screw that, I don't want to be in the city anymore, sold the house and moved to the coast.....roughly the time load shedding kicked into overdrive last year end September, Im still trying to cope! Gimme some hopeYou're lucky block 11 here in JHB is exactly the same
Yeah here the slots are the same, it's just the length of the slots that are better. I would have had 6 hours tonight, from 21-01 and then again from 03-05Yea tomorrow I don't change at all either. Hooray.
Dont spoil it for the rest of us...Woohoo!!! Stage 3/4! what am I gonna do with all that electricity??!! I know, tonight I'll treat myself and switch on the bathroom light, So I can see the loo and not just guess
Eskom will probably have to bring another power station out of planned maintenance when my bathroom light goes on....expect the power to dip guysDont spoil it for the rest of us...
Standing by....Eskom will probably have to bring another power station out of planned maintenance when my bathroom light goes on....expect the power to dip guys
Eskom will probably have to bring another power station out of planned maintenance when my bathroom light goes on....expect the power to dip guys
Well, Frogfoot is down (or as I'd like to call them "If Eskom was an FNO"), so I might drink a load of beer, but I'll make sure to pace myself till 12Try and hold it till 12ish so we can finish our movie please.