Prepare for Eskom load shedding tonight

How did you get you matric pass results? What time are the newspapers with matric pass results delivered? First use memory, and then use logic from there.
Sounds like you could do with a little more logic in your life bud ;)
It just sounds like you're babbling off some garbage that makes sense in your pip . . and that's about the only place it makes sense.

You're hilarious though. Do carry on. But remember, first use memory and then logic from there okay?
 
I did not stay up till 12 to see if i had passed, i can't recall exactly but i think i used a digital channel. Either way a power outtage wouldn't have prevented anything in various areas, my cellphone still works as does the network for sometime, garages are still open with generators etc. logic.

They easily could have said load shedding will be delayed by 1 hr from 12pm to allow for matric results to be received after which loadshedding will commence from 1-6.

You are just expecting too much from them.
 
Same here. :(

Also bloody irritating because then I cant sleep with the fan on and that means two things. Struggling to sleep because of the heat ..... and MOZZIES. :mad: Maybe I will just pop TWO Stilnox and knock myself out.
A mosquito net will help with one of those 2 things - makes all the difference in my world- mozzies latch on to me on some sort of supernatural level
 
So thoughtful of Eskom, nothing like a romantic candle lit dinner, practice run before Valentines day.

Though if you don't have electricy then you can't cook so do you just skip straight to the after dinner desert?
 
i ssupect 00:00-06:00 is going to become a daily thing.
Seems like a solid strategy - load shed at night when it doesn't really affect most businesses and use the pump storage as a giant battery with soon to come online solar (hopefully) to run things to cater to day peak usage.
 
Seems like a solid strategy - load shed at night when it doesn't really affect most businesses and use the pump storage as a giant battery with soon to come online solar (hopefully) to run things to cater to day peak usage.

i mean it is better than this sporadic constant shedding otherwise, it does have its issues in some senses yes but i think overall it is a bit better. they should have been doing things like this 10 years ago though, not now. You would also hope that they would be constantly working to long term fix issues as well, but nope. i mean sure loadshed us all for a year 3hrs a day constant for example, but then do the maintenance etc.
 
Personally I can buy that, and think they need to do that currently regardless... use it to replenish the pumped storage and such....

yeah it is more sensible for the economy and commuting etc but it still affects people, think of security systems and oxygen machines etc.
 
Whats more disturbing is how their "unplanned breakdowns" appear to be able to follow some kind of schedule...
 
Whats more disturbing is how their "unplanned breakdowns" appear to be able to follow some kind of schedule...

what always makes me wonder is how they can be some vague number out, like where does 47MW come from, i thought the units were ~600MW, does this mean they are running units well below design to just keep them going?
 
yeah it is more sensible for the economy and commuting etc but it still affects people, think of security systems and oxygen machines etc.

Yeah, my dad has a machine for his sleep apnea. Night time load-shedding plays havoc, although he does tend to only go to sleep after 2am, so it's really the 2-4:30am and 4:6:30am slots which are a real bugger for him.
 
what always makes me wonder is how they can be some vague number out, like where does 47MW come from, i thought the units were ~600MW, does this mean they are running units well below design to just keep them going?

for example between this morning and tonight they brought 72MW back online

edit:

from eskoms site:

Eskom’s power stations each have between two and six units. The output of these units range from 970MW per unit at Koeberg nuclear power station to as little as 57MW per unit at the Port Rex gas-fired power station. Only eight MW is needed to supply a little town like Parys in the Free State and more than three 600MW units are needed to supply the 1 947MW peak demand required to power the Tshwane Metro area.
 
interesting that this mornings notice only said over 14000MW, its like they are being purposefully deceptive now, not just out of stupidity.
 
Top