TIME: 5 Feb 2010 12:54:32 PM
ADDITIONAL: Please note that the power reconfiguration on SAT3 maintenance is taking place on Saturday 6 February 2010 (0:01 to 04:00 UTC).
Restorable traffic is not at risk and we will still experience the longer traffic path. Only after successful power reconfiguration, all restored traffic can then be normalized back to their normal routes on SAT-3 and the system is back to normal. Tentative normalization scheduled for Sunday
7 February if power has been restored to normal configuration and no shunt is detected. No downtime expected as all our links are on restoration.
POINTS OF IMPACT:
Gallo Manor - Johannesburg
Great Westerford - Cape Town
International
OPENING TIME: 20 Jan 2010 5:29:27 PM
CAUSE OF PROBLEM: Telkom Maintenance
SYMPTOMS EXPERIENCED: High Latency
SEVERITY: Critical
STATUS: Attending
ATTENDING: Telkom Engineers
ADDITIONAL: Please note that Telkom SA is conducting major maintenance on the shunt fault on Segment 14 of SAT-3, about 627 km from the ACC Beach Manhole. This maintenance will run from the 20-22 January 2010 and resume again on the 29 January to 01 February 2010 within the maintenance window
(00:01 to 04:00 UCT). Due to this maintenance, there will be intermittent high latency to London UK and Paris for the duration of this maintenance.
The latter will take place during and after the maintenance window.
ADDITIONAL: Please note that the power reconfiguration on SAT3 maintenance is taking place on Saturday 6 February 2010 (0:01 to 04:00 UTC).
Restorable traffic is not at risk and we will still experience the longer traffic path. Only after successful power reconfiguration, all restored traffic can then be normalized back to their normal routes on SAT-3 and the system is back to normal. Tentative normalization scheduled for Sunday
7 February if power has been restored to normal configuration and no shunt is detected. No downtime expected as all our links are on restoration.
POINTS OF IMPACT:
Gallo Manor - Johannesburg
Great Westerford - Cape Town
International
OPENING TIME: 20 Jan 2010 5:29:27 PM
CAUSE OF PROBLEM: Telkom Maintenance
SYMPTOMS EXPERIENCED: High Latency
SEVERITY: Critical
STATUS: Attending
ATTENDING: Telkom Engineers
ADDITIONAL: Please note that Telkom SA is conducting major maintenance on the shunt fault on Segment 14 of SAT-3, about 627 km from the ACC Beach Manhole. This maintenance will run from the 20-22 January 2010 and resume again on the 29 January to 01 February 2010 within the maintenance window
(00:01 to 04:00 UCT). Due to this maintenance, there will be intermittent high latency to London UK and Paris for the duration of this maintenance.
The latter will take place during and after the maintenance window.