Stage 3 and stage 4 for the weekend

Hanno Labuschagne

Journalist
Staff member
Joined
Sep 2, 2019
Messages
6,543
Reaction score
4,845
Stage 3 and stage 4 for the weekend

Eskom will increase load-shedding to stage 3 and stage 4 over the weekend due to further setbacks in its generating fleet's performance.

In a statement on Friday afternoon, the utility said that it had to shut down six generating units and there was a delay in returning three additional units to service.
 
Ramaloskopa must follow the Islamic calendar. Man's still got a couple centuries to end loadshedding by 2024.

Stage 4 with 25GW peak demand is fking ridiculous. How did we get through Winter with like 2GW planned maintenance? Hanging by a thread.
 
Ramaloskopa must follow the Islamic calendar. Man's still got a couple centuries to end loadshedding by 2024.

Stage 4 with 25GW peak demand is fking ridiculous. How did we get through Winter with like 2GW planned maintenance? Hanging by a thread.
2GW planned is almost 6GW lower than now, plus we were hitting stage 4
 
2GW planned is almost 6GW lower than now, plus we were hitting stage 4
Yeah I mean those power stations must have been running severely overtime if they need to maintain almost 4x as much now.
 
Yeah I mean those power stations must have been running severely overtime if they need to maintain almost 4x as much now.
Apparently that's the summer way, as it's normally lower usage
 