So almost certainly Stage 2 load-shedding tomorrow. It was due to go down in a week though...

Chris Yelland @chrisyelland · 55m 55 minutes ago
Unit 1 at Eskom's Koeberg nuclear power station out of service due to fault on the transformer.

.@mpdjhb Unit 1 at Koeberg, now down due to main generator transformer fault, was to shut down on 9 Feb 2015 for maintenance & refuel.
 
F..k. Loadshedding from tomorrow for the next 8 weeks or so. Almost guaranteed as they will put the maintenance window forward.
 
Eskom Media Desk @Eskom_MediaDesk · 2h 2 hours ago
#Koeberg: Although the system remains stable it may be vulnerable overnight. Govt & Eskom will give an update on Koeberg tomorrow morning.
Yip here we go.
 
By: Yolandi Groenewald, City Press
2015-02-01 19:57
Johannesburg - Cabinet has been briefed by Eskom about the risk of a total national electricity blackout – and the US embassy in Pretoria has drawn up an evacuation plan partly designed to get its staff out safely if the lights go off in South Africa once and for all, reported Fin24's sister publication City Press on Sunday.

Senior government sources told City Press that Eskom late last year presented a bleak picture of what would happen if load shedding failed and the system shut down completely.
“It’s a fact. They said we needed to do maintenance because the system was unreliable and would shut down,” said a senior government official.
Eskom warned government that, if the system crashed, it would take at least two weeks to reboot.
A second official privy to the information presented to cabinet said the “two-week warning” was based on what had happened in California when its electricity system shut down in 2011.
“When your car battery is flat, you need additional capacity to be able to boost it. This is how our system works. California had to buy an amount of power equal to their total capacity to be able to reboot their system,” the second official said.

READ: Eskom CEO: SA's reserve tank almost exhausted
“We don’t want to go there, because all our neighbours are buying from us. No one in Africa has 42 000MW of power.”
The insider said Eskom had warned government it had no option but to continue load shedding, despite senior ANC and government officials being unhappy about the ongoing power cuts.
“We can’t afford a total blackout. We don’t have that luxury,” the second official said.
Reuters reported on Friday that in the event of a national blackout, President Jacob Zuma and his cabinet would be taken to a secret location and soldiers would be deployed at national key points, such as the SA Reserve Bank and the SABC’s head office in Auckland Park, Johannesburg.

READ: ANC is racing to rescue Eskom, says Zuma
Eskom this week refused to be drawn on the chances of a large-scale blackout happening and merely said it would continue to implement load shedding to protect the grid, as this was the best way to protect South Africa’s power system.
US embassy staff are now taking a hard look at South Africa’s power situation on a daily basis.
US Embassy spokesperson Jack Hillmeyer confirmed the embassy had a plan, but said it was “standard procedure”.
“The safety and security of our American and local staff and facilities is a top priority,” he said. “As we do in our locations throughout the world, we plan and prepare for possible emergency situations we may face. Our planning in South Africa is similar to what we do in all countries.”
Hillmeyer said he could not discuss specifics about safety and security planning for “obvious reasons”.
Eskom sources have told City Press a national blackout was a “very significant possibility for the foreseeable future”.
Two sources told City Press the situation had become even worse over the past month.

READ: Eskom: SA on power alert
Eskom should be able to generate 43 300MW of power on a 24-hour basis. However, on a good day, the power utility only produces 71% of its generation capacity owing to faults at its power stations – and the need for maintenance is critical. Lately, according to the utility’s own graphs, they have been operating at 65% on most days.
Two weeks ago, Eskom CEO Tshediso Matona told a closed meeting of 100 of South Africa’s top business leaders that his senior management “prays every day” that nothing unforeseen happened to collapse the national grid infrastructure, causing a potentially catastrophic nationwide blackout.

A CEO in the telecommunications industry, who did not attend the meeting, but was informed of Matona’s message, told City Press companies not drawing up plans for a worst-case scenario were being “daft”.
“We certainly have had meetings on the issue and God help us all if it does happen, but we can’t sit around doing nothing if the Eskom head himself has warned us,” he said. He did not want to elaborate on his company’s plans to survive a national blackout.
For more and how officials can't afford to take their eyes off the grid, read here.

City Press
 
Hello darkness my old friend. Not good news. :(
 
So, ESKOM is ahead of schedule for the maintenance of Koeberg (/sarcasm)
 
and we have already had no power since 11:30 this morning, and no one seems to know why as there is no load shedding planned. So 2 pcs blew and the fridge now is making an odd noise,
 
and we have already had no power since 11:30 this morning, and no one seems to know why as there is no load shedding planned. So 2 pcs blew and the fridge now is making an odd noise,

lesson learned; unplug fridges, tv's, PC's air cons, basically everything except house lights from the plug directly; not enough to switch it off by the plug;
leave one house light switched on so you know when the supply returns; and take out the candles;

when the electricity returns; it spikes and shorts out everything, and even those surge protectors cant help you;

been doing this for years; and heard so many people throw out perfectly good appliances because of this;
 
lesson learned; unplug fridges, tv's, PC's air cons, basically everything except house lights from the plug directly; not enough to switch it off by the plug;
leave one house light switched on so you know when the supply returns; and take out the candles;

when the electricity returns; it spikes and shorts out everything, and even those surge protectors cant help you;

been doing this for years; and heard so many people throw out perfectly good appliances because of this;

All good advice one problem though, there is not suppose to be load shedding today? So we were working and then bam, the power off and smoke. The Electric Department don't even know there is an issue, nothing shown on their systems. So now we have been sitting for 4 hours with no power.
 
Last edited:
Anyone know why there's been another acting CEO quoted in all the statements recently? Dan Maroke (I think that's his name). What happened to the dude from the beginning of Jan who gave the whole shpeel about their future etc.??
 