TheMightyQuin
Not amused...
Ja, but that only answers the second part of my question...
South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
Ja, but that only answers the second part of my question...
Your milk goes off in a cold fridge that has no electricity for 4.5 hours?Fridge gets too warm(after last night had to toss my new milk)
Your milk goes off in a cold fridge that has no electricity for 4.5 hours?![]()
I'm not so sure about this loadshedding. In 2008 (our around there), we had it for quite a while, and then it stopped for years. What got better? I know this sounds dumb, but it's a question.
Not when the batteries get stolen every time they are replaced.
JHB tried the solar route found it too expensive.
http://www.iol.co.za/news/south-africa/it-s-no-go-for-solar-powered-traffic-lights-1.407910
The "Solar Route" was meant to save energy costs, more than reduce traffic congestion. It was more economical to replace the bulbs with LEDs.
I'm not proposing solar. I'm proposing a pure grid based battery backup recharged when the power returns. It is not meant to save electricity, only end congestion during power cuts.
It is a cop-out to say "Oh but the batteries will be stolen". Put the damn things in 50mm thick armour plated monster safe boxes mounted 5m in the air on a pole or buried underground with alarms. These are major intersections, not dark, quiet streets where criminals can work unseen.
Your milk goes off in a cold fridge that has no electricity for 4.5 hours?![]()
Loved this last bit: "Perhaps our President will address this head-on in his State of the Nation address on Thursday. Wait, who am I kidding?"
That's it. I'm moving to North Korea!
It would grate me but I would agree to a daily Stage 1 blackout schedule until May.
We can then plan our activities accordingly.
This current guessing game is rubbish.
In a sense yes, but no, it was new milk. A bag of milk(buying shelf box from now on) It went off as it was hot and power was off when brought it home. Between traffic and heat in car, the fridge without power wasn't enough to cool it(fridge had defrosted already, water dripping)... so, more like I didn't have ability to cool warm milk fast enough, and that must have started a reaction in milk which turned overnight.
But this plan wouldn't work like that, would it?
If they take 2000MW offline in order to do planned maintenance, that would be a guaranteed Stage 2 load shed. But we're still stuck then with a very low reserve margin powered by unreliable, unmaintained plants that will threaten to drop us into Stage 3 or beyond. Taking plants out of service like this wouldn't do anything to increase predictability, it would just move our risk from 0MW-2000MW shortfall to 2000MW-4000MW shortfall.
That leaves you still being unable to predict your day.
Does Zuma (and the Cabinet) even know that Eskom are load-shedding ?
And that Eskom's top management are lying through their back teeth ?