- Joined
- Oct 16, 2018
- Messages
- 5,031
- Reaction score
- 1,585
Eskom stage 4 load-shedding
Eskom has announced it will increase load-shedding to stage 4 from 14:00 today following additional breakdowns.
Eskom said Koeberg Unit 1 tripped, and has been disconnected from the grid because of a fault on the turbine side, and confirmed that the nuclear reactor remains safe.
Eskom has announced it will increase load-shedding to stage 4 from 14:00 today following additional breakdowns.
Eskom said Koeberg Unit 1 tripped, and has been disconnected from the grid because of a fault on the turbine side, and confirmed that the nuclear reactor remains safe.