poweralert stage 2.....

Status
Not open for further replies.
Nope that was a Friday, you'd need to look at the following Monday
Eskom Hld SOC Ltd
@Eskom_SA
Evening Peak 01/05/2023 (18:26)

Eskom Availability: 26 225MW
Load shedding: 2 951 MW
Total demand: 29 149 MW
———————————
Total Number of OCGT's Utilised: 16
Renewable Gen: 1 074 MW
IPP Availability (Dispatchable): 1 014 MW
RES: Wind 824 MW, CSP 250 MW
Demand incl: ILS: 0 MW, VPS: 0 MW, LS
Esk Availability incl: 0MW C/R & Non-comm Peak in Peak sentout: 26
 
Eskom Hld SOC Ltd
@Eskom_SA
Evening Peak 01/05/2023 (18:26)

Eskom Availability: 26 225MW
Load shedding: 2 951 MW
Total demand: 29 149 MW
———————————
Total Number of OCGT's Utilised: 16
Renewable Gen: 1 074 MW
IPP Availability (Dispatchable): 1 014 MW
RES: Wind 824 MW, CSP 250 MW
Demand incl: ILS: 0 MW, VPS: 0 MW, LS
Esk Availability incl: 0MW C/R & Non-comm Peak in Peak sentout: 26
Nope that was a Friday, you'd need to look at the following Monday

I didnt choose this day because it was a public holiday i believe?

The week however went from a low of 28.5 to a high of 31. The high was the startup from a long weekend and possibly a cold front.
 
Last edited:
I didnt choose this day because it was a public holiday i believe?

The week however went from a low of 28.5 to a high of 30. The high was the startup from a long weekend and possibly a cold front.
Ya, the day after this one had demand over 31
----
Evening Peak 02/05/2023 (18:14)

Eskom Availability: 24 968 MW
Load shedding: 6000 MW
Total demand: 31 390 MW
———————————-
Number of OCGT's and GT’s Utilised: 15
Renewable Gen: 766 MW
IPP Availability (Dispatchable): 1014MW
RES: Wind :475 MW, CSP:243 MW,PV:48 MW
Demand incl: ILS:447 MW, VPS: 401 MW &LS
Peak in Peak sentout: 24 542 MW
Esk Availability incl: 0MW C/R & Non-comm
 
Ya, the day after this one had demand over 31
----
Evening Peak 02/05/2023 (18:14)

Eskom Availability: 24 968 MW
Load shedding: 6000 MW
Total demand: 31 390 MW
———————————-
Number of OCGT's and GT’s Utilised: 15
Renewable Gen: 766 MW
IPP Availability (Dispatchable): 1014MW
RES: Wind :475 MW, CSP:243 MW,PV:48 MW
Demand incl: ILS:447 MW, VPS: 401 MW &LS
Peak in Peak sentout: 24 542 MW
Esk Availability incl: 0MW C/R & Non-comm
Yeah but it was also stage 6, so there is probably a demand shift of 2GW, load shedding actually adds Demand shift as well
 
Are you telling me the economy hasn't contracted?

Im saying you can no longer tell by just going off the eskom figures. If you want to see the performance of the economy there are better metrics.
 
@Brian_G and other conspiracy theorists, they are going to install the generator at Medupi, it is going to add something into the grid, further improving the loadshedding situation.

Just putting it out there so that you can factor it in when you are formulating your legendary tall tales.

confusios says- conspiracy not about electricity but politics
 
Maybe but that would just be speculation at this point. We will get a better idea in a few months for the stats from the first quarter and a while longer for stats in the 2nd quarter.
Indeed. Also, 12 hours a day of no power and double digit increases will destroy many small businesses.
 
Strange how the closures reached a noticeable peak just before elections. Hmm
 