poweralert....

Status
Not open for further replies.
Forget Zim 2.0 we are turning into ****ing Somalia
Yeah, our MyCadres become triggered when we say we're devolving to Zimbabwean state.

We should rather, going forward, be hyperbolic and say Somalia.
 
So this confirms then that absolutely rat's ass maintenance was done over December?
From what I've read, a bunch of those units died as soon as they were started.

Also no update from Sikonathi.... That can't be good lol
 
Last edited:
Evening Peak Feedback 11/01/2023, 19:35
Total demand: 28 628MW
Loadshedding: 5 088MW
Virtual Power Station: 223MW
Eskom OCGT's Utilised: 12
IPP OCGT's Utilised: 3
Renewable Gen: 662MW (Wind 554MW, CSP 108MW)
@Eskom_SA Available Generation Capacity: 24 414MW
@EskomSpokesper1

Let me go look at at that stage 8 schedule so long...
 
Evening Peak Feedback 11/01/2023, 19:35
Total demand: 28 628MW
Loadshedding: 5 088MW
Virtual Power Station: 223MW
Eskom OCGT's Utilised: 12
IPP OCGT's Utilised: 3
Renewable Gen: 662MW (Wind 554MW, CSP 108MW)
@Eskom_SA Available Generation Capacity: 24 414MW
@EskomSpokesper1

Let me go look at at that stage 8 schedule so long...
Oof, 15 OCGT...
 
Yes 15 of them and we were still on Stage 6, oh dear...

Oof, 15 OCGT...

After sending my brother numerous insights from various sources we're finally getting solar (he told me after he got back home from holiday last night) at his property (where I rent). Some repair work needs to be done on the roof next week first so just hope it will be in time and there won't be supply chain issues before this energy situation gets worse...
 
These are the soldiers being deployed to protect power stations, they cant even protect themself lol
 

Attachments

  • Screenshot 2023-01-12 103047.jpg
    Screenshot 2023-01-12 103047.jpg
    74.8 KB · Views: 66
These are the soldiers being deployed to protect power stations, they cant even protect themself lol
That soldier have got absolutely no SA.

The first thing any soldier/grunt need to develop post haste, is an extremely sensitive SA, and to never let his guard down no matter where he/she may be.
 
We had 10 hours of loadshedding. Power went off for a scheduled outage from 18:00 - 22:00 and then never came back until after the next 02:00 - 04:00 slot. Not sure what happened there, but it doesn't bode well.

Same situation here, went out from 10pm to 12am,didnt get restored until 2am so effectively double shift. Then again didn't return after the 6-10am shift and only restored at 11:15am and we have another 4 hour stint coming up at 2pm
 