Engineer nogal
You can be book smart and still be as dof as a tree stump
South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
Engineer nogal
That one's just corrupt not dom.Engineer nogal
You can be book smart and still be as dof as a tree stump
www.eskom.co.za


www.eskom.co.za


Yes that didn't age too well, neither did this one
![]()
In a statement on the afternoon of Thursday, 13 April 2023, the utility revealed that its total unavailable capacity stood at an astronomical 24,424MW.
“Breakdowns have increased to 18,617MW of generating capacity while the generating capacity out of service for planned maintenance is 5,807MW,” Eskom said.
At those levels, Eskom’s total outages are about equal to its current generating capacity.
Holy ****
We are still shedding 9 stages permanently. You should be grateful we make sacrifices after stage 4.How is Durban still getting away with kak like this (not that I'm complaining while I'm here)...
View attachment 1507897
2.2GW lower from 2 nights ago that's scaryBetter font...but wow, actually Stage 8. Industrial customers taking a mega-hit. Basically, nothing has been fixed since yesterday and they lost one of the Medupi power stations.
View attachment 1507927
I know. Thank you for your service. Lets hope the country doesn't vote ANC anymore.Those are 2 hour sessions, and there's only 3 of them. This is what stage 6 looks like back home...
View attachment 1507931
View attachment 1507827Station build-up for the last 7 days - Eskom Data Portal
This shows how resources were used to build-up the demand over the past 7 days, and it includes both generation and demand side resources that Eskom has contracts with.www.eskom.co.za
View attachment 1507829
View attachment 1507831System hourly demand and available capacity - Eskom Data Portal
Hourly demand is compared against available capacity, to indicate the amount of surplus/shortfall there was. Available capacity must be matched with the total RSA contracted demand.www.eskom.co.za
View attachment 1507833
What in the world is load curtailment? I think it might also be manual load reduction. But what is Eskom doing? Cranking up some old engine?Better font...but wow, actually Stage 8. Industrial customers taking a mega-hit. Basically, nothing has been fixed since yesterday and they lost one of the Medupi power stations.
View attachment 1507927
Load curtailment is when Eskom asks large energy users to reduce their power usage so the smelters and all those guysWhat in the world is load curtailment? I think it might also be manual load reduction. But what is Eskom doing? Cranking up some old engine?
It's stage 8 without calling it stage 8.What in the world is load curtailment? I think it might also be manual load reduction. But what is Eskom doing? Cranking up some old engine?
Monday (2am+4pm) and wednesday (4am+8pm) I also have it twice a day.
How does 6 + 4 = 7? How many MW is stage 4 curtailment?Load curtailment is when Eskom asks large energy users to reduce their power usage so the smelters and all those guys
They're shedding 6000 so the balance must be this stage 4 curtailment. Give or take. Obvious?How does 6 + 4 = 7? How many MW is stage 4 curtailment?
Stage 4 load curtailment: something they just made up? Waiting for tomorrows charts, want to see this "stage 4".