Crusader
Executive Member
My landlords finally decided that they are ready to go for solar.
To power the 3 properties (main house + 2 apartments) they are opting for:
16kW Deye Inverter
2 x Volta Stage 3 10.34 kWh Batteries (20 kWh total)
11 kW Solar panels (not sure about brand or size)
Excited to see how it turns out once installation is done. Personally I would've gone for a Sunsynk, but can't see any major issues with the system they decided on together with the installer.
To power the 3 properties (main house + 2 apartments) they are opting for:
16kW Deye Inverter
2 x Volta Stage 3 10.34 kWh Batteries (20 kWh total)
11 kW Solar panels (not sure about brand or size)
Excited to see how it turns out once installation is done. Personally I would've gone for a Sunsynk, but can't see any major issues with the system they decided on together with the installer.
Last edited:



