Hadyard Hill, owned and operated by Scottish and Southern Energy (SSE), has become the first wind farm in the UK to generate over 100 megawatts (MW) of power.
The 120 MW, 52-turbine wind farm in South Ayrshire reached the milestone as it nears completion of its commissioning phase.
LOL - Wind! the answer
http://www.bwea.com/media/news/060411.html
52 Turbines! .. 120MegaWatt!! Eskom is Load Shedding due to a shortfall of 2000MegaWatt. Someone didnt get their cleverer sleep.
Wind power for SA is not really viable - keeping in mind that the power is only being generated when the wind blows. SA does not have significant areas where the wind blows continuously and strong enough to supply base load demand. And if the wind is not reliable, you still have to provide back-up so the capital cost is double.
East London?
What % of 24/7/52 does it blow in EL?
Eskom have been looking at wind power for decades (I have been involved in some of the studies in 1990's) and it is not a reliable or capital and cost effective solution to the current problems. It should be implemented in SA as supplemental power to reduce output of older and less efficient coal stations or in conjunction with a water storage scheme, but not as a base-load first tier generation system. Wind is not reliable enough in SA.
LOL! Too late now hey. You need money which you no longer have due to ANC corruption in order to build wind farms. Rather look to IPP.
The wind farms mentioned in the original article were built and are operational. This is a new proposal.Thread necro. A mere 12 years after proposal:
![]()
Huge West Coast wind farm approved | Business
But conditions include a revised environmental management plan and site layout.www.fin24.com