Hi all, long thread 
I'd like to setup an Axpert 5kVa with PV to generate in the region of 8kWh/day. I'd only add battery's as a way to use some excess generated power at night. I am trying to get a short as possible payback period. UPS type functionality during load shedding is less important.
1. Am I correct that insufficient power generated from PV will cause the Axpert to rely solely on the grid during that time?
2. What happens when the total required load is more than the Axpert is rated for? So someone switches on an oven for instance. Do you have to isolate circuits so that the total load never exceeds the Axperts max or does it just happily bypass to grid?
Thanks
I'd like to setup an Axpert 5kVa with PV to generate in the region of 8kWh/day. I'd only add battery's as a way to use some excess generated power at night. I am trying to get a short as possible payback period. UPS type functionality during load shedding is less important.
1. Am I correct that insufficient power generated from PV will cause the Axpert to rely solely on the grid during that time?
2. What happens when the total required load is more than the Axpert is rated for? So someone switches on an oven for instance. Do you have to isolate circuits so that the total load never exceeds the Axperts max or does it just happily bypass to grid?
Thanks