South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
If the air is moving up, how do they fans work harder if the air is moving out of them already?I'd do it the other way around. Fans at the bottom and vents on top. Hot air already rises. Otherwise you're making the fans work harder to get the hot air out...
That's what I said, hence the otherwise?If the air is moving up, how do they fans work harder if the air is moving out of them already?
I'd do it the other way around. Fans at the bottom and vents on top. Hot air already rises. Otherwise you're making the fans work harder to get the hot air out...
I meant with the fans at the top blowing out, the air is moving out naturally already so how can it be working harder? Same with the bottom, if the fans are blowing in, the air is naturally moving in so also wouldn't be working harder. The advantage of having them at the top, you can put filters on the bottom vents keeping dust out.That's what I said, hence the otherwise?
The tinkering never stops... I know...I thought it time for a bit of an update, the system has been running for a little over a month, 3 weeks of which we were on holiday so not home at all. Other than what I have planned to get done in the near future, the system has handled everything well thus far, besides the electric geysers, electric ovens and underfloor heating it powers everything in the house. So, future plans...
- Move CT coil/clamp to proper position;
- Install cooling fans to direct airflow away from inverter;
- Put vents in cupboard doors and reinstall;
- Additional PylonTech UP5000 before winter.
Related future plans...
- Change geyser elements from 3kW to 2kW;
- Remove geyser timer and load control relays;
- Smart CB or similar solution to manage geysers.
I will then monitor to see how the system does and go from there.
The tinkering never stops... I know...
Wow and you guys have been there how long?Hit our first 1MWh yesterday...
![]()
And hit a peak PV generation of 9kW at 10:30 this morning...
View attachment 1466261
Wow and you guys have been there how long?
Wow ok time flies, feels like it was only like last weekMoved in on the 26th November, installation started on the 6th December and finished on the 7th December.
Yep, need to get Home Assistant up and running again as well, but we are in a new house with a ton of stuff to do that my wife wants done yesterday![]()
Just don't install out on a Pi, this time.![]()
I've got an old laptop that I want to setup as home assistantYeah, I plan on doing something similar to you, mini PC run as a server.
I've got an old laptop that I want to setup as home assistant