Normally they blame EskomI don't blame them. What is CP supposed to do when ESP says there's loadshitting?
South Africa’s biggest forum. Discuss, discover, and connect with thousands of members.
Normally they blame EskomI don't blame them. What is CP supposed to do when ESP says there's loadshitting?
Large munis are different, Eskom doesn't cut the HV feeds, the muni's are contracted to reduce and handle internal load shedding to compensate. As long as COJ is within the required reduction, how they manage the internals is their business.IWBIWISI
Watch Eskom still cut them off just like they do with Frankfort because PV isn't dispatchable.
Not according to CPLarge munis are different, Eskom doesn't cut the HV feeds, the muni's are contracted to reduce and handle internal load shedding to compensate. As long as COJ is within the required reduction, how they manage the internals is their business.
So what happens when a cloud comes over during loadshitting? Sudden unannounced “power failure”?Large munis are different, Eskom doesn't cut the HV feeds, the muni's are contracted to reduce and handle internal load shedding to compensate. As long as COJ is within the required reduction, how they manage the internals is their business.
Odd then because Durban doesn't, the city runs its own internal switching, which a large number were just upgraded.Not according to CP
I'm talking about a muni's management of the grid and Eskom incoming feed. AFAIK, Eskom does not cut the feed but Ethekwheni is contracted for certain amounts. The cuts are at the internal level.So what happens when a cloud comes over during loadshitting? Sudden unannounced “power failure”?
iro how they manage it being their business? Yep, not a good record to date but the fact they keep reaching beyond the Eskom/ANC grip is promising.Not according to CP
There are portions the munci maintains and there are ones Eskom does, apparently CP doesn't do the turn off that's Eskom as it's a signal from them.Odd then because Durban doesn't, the city runs its own internal switching, which a large number were just upgraded.
Switching the HV on and off would cause massive wear on that.
Yes, but how can CP guarantee to reduce their load then when they're boasting about these projects allowing them to drop one shitting level?I'm talking about a muni's management of the grid and Eskom incoming feed. AFAIK, Eskom does not cut the feed but Ethekwheni is contracted for certain amounts. The cuts are at the internal level.
Still sub-controlled by CP though I'm sure, their equipment beyond the main stage-control point and their software.There are portions the munci maintains and there are ones Eskom does, apparently CP doesn't do the turn off that's Eskom as it's a signal from them.
Other projects are involved. Who knows, maybe new plans for Kelvin as well. They're not gonna announce it without some structure, even if they do end up breaking the offer again.Yes, but how can CP guarantee to reduce their load then when they're boasting about these projects allowing them to drop one shitting level?
Contractual penalties, its managed on a business level.Yes, but how can CP guarantee to reduce their load then when they're boasting about these projects allowing them to drop one shitting level?
From the conversations with the Durban electrical guys, all the signals are handled internally, we even discussed recently plugging the local water pump stations ( which are stupidly being switched off during loadshedding ) directly to the HV circuits as a easy way to exclude them from shedding.There are portions the munci maintains and there are ones Eskom does, apparently CP doesn't do the turn off that's Eskom as it's a signal from them.
You wanna bet?Other projects are involved. Who knows, maybe new plans for Kelvin as well. They're not gonna announce it without some structure, even if they do end up breaking the offer again.
BookmarkedYou wanna bet?
After 4pm as well?Again a day where the stages are too high
Yup after 4pm it should be stage 1 maybe 2After 4pm as well?
Does that factor in the buffer?