Those articles seem to imply that both the municipal officials and the construction managers were colluding to bypass regulations?
The exact levels of blame are hard to determine without a detailed legal inquiry (some names were listed early in this thread). What is clear is that none of the normal processes were followed. We don't know the actual trigger for failure, but that seems almost irrelevant given all the rules being broken.
I'm not sure that the two are even linked; broken rules and the trigger. Most likely is either design, materials or construction, or a combination, external events like earthquake etc can be excluded methinks. The "report" or its summary, doesn't appear to deal with these at all that I have seen. Having inspectors, municipal or NHBRC, to pick up issues is unlikely IMHO, even if they were well qualified and had the time. The "trigger" as I see it is the moment the loads exceed the strength (duh) so one of the two, maybe both, need checking.
Would also imply major failures on the part of the private architects & town planners + municipal building office, urban planning division and engineering division.If you read the News24 article, none of the people on the project had appropriate qualifications. A home-builder cannot calculate the loads and structural strength of a 4 storey reinforced concrete building. Nor can they do the required inspections of rebar size and spacing, concrete slump testing and hardening periods etc. The minister did not say so (for legal reasons), but it is obvious to any objective observer that the issues are connected.
I'm not an expert, but have watched a 4 storey building go up across the road from me, and it takes a lot of time and expense to do properly. Cut either of these factors, and bad things happen.
because as usual in SA, if the skin colour is right, they get the contract.So tell me why this went wrong.
because as usual in SA, if the skin colour is right, they get the contract.
I see this different an architects dreams becomes an builder / engineers headacheArchitect is normally the principle agent on a project. When trouble hits the fan, he has to report.
Work goes out on tender for ground works building plumbing electrical flooring etc.
Cheapest installer / contractor wins.
On building core concrete samples need to be tested on each batch. So they should have this documentation.
Then we the construction mafia / and government that forces builders to use 25 % of labour has to be done by local unskilled Workers.
So tell me why this went wrong.
@Jet-Fighter7700 is a Israeli jew (so basically Arab) but he bats for whites in the hope he will be recognized one day.You're saying the contractor wasn't a 'white' firm in this fsckup?
me Arab? you must be looking for the terrorist elsewhere.@Jet-Fighter7700 is a Israeli jew (so basically Arab) but he bats for whites in the hope he will be recognized one day.
Not in Africa anymore. Here it is whatever is the "cheapest", which ends up being the builder or developer or in government projects or large projects, the BBBEE beneficiary. Architects are now only slightly "better" than a draftsman in the role that they play.Architect is normally the principle agent on a project. When trouble hits the fan, he has to report.
Resigning as director does not absolve your responsibilitySo in summary:
A home builder was building a 5 story building using unskilled labour.
No plans was approved and building inspectors were incapable of doing their jobs due to the technical nature of the building?
All directors of the company responsible resigned.
Anyway, who is going to jail?
Yea supervision is a % valueNot in Africa anymore. Here it is whatever is the "cheapest", which ends up being the builder or developer or in government projects or large projects, the BBBEE beneficiary. Architects are now only slightly "better" than a draftsman in the role that they play.
Have a look at Casey Jones on YT - some interesting stuff.Makes the George one look like a little rubble.
https://www.gov.za/news/media-state...-final-report-george-building-collapse-09-aprGeotechnical and Engineering Assessment deficiencies
The geotechnical report provided did not include crucial information such as trial pit locations, Dynamic Cone Penetrometer (DCP) test results and geological maps. This information is essential for foundation design and site preparation.