Evening Peak Feedback 24/10/2022 17:30 Total Demand: 29 250MW Loadshedding: 3 800MW Interruptible Load Supply: 447MW Virtual Power Station: 373MW Eskom OCGTs Utilised: 9 IPP OCGTs: 2 Renewable Gen: 1 340MW (Wind 927MW, CSP 349MW, PV 64MW)
@Eskom_SA
Avail Gen Capacity: 27 121MW
 
  • Sad
Reactions: Yuu
Evening Peak Feedback 24/10/2022 17:30 Total Demand: 29 250MW Loadshedding: 3 800MW Interruptible Load Supply: 447MW Virtual Power Station: 373MW Eskom OCGTs Utilised: 9 IPP OCGTs: 2 Renewable Gen: 1 340MW (Wind 927MW, CSP 349MW, PV 64MW)
@Eskom_SA
Avail Gen Capacity: 27 121MW

Slowly regaining some capacity.
 
When they said they decided to go against permanent stage 2 3 they meant they decided against saying it out loud.
FTFY


Still wanna know, how is it that this last week S4 has been needed overnight but our whole working country only needed S3 during the day :unsure:
Simple answer really: BS
 
FTFY


Still wanna know, how is it that this last week S4 has been needed overnight but our whole working country only needed S3 during the day :unsure:
Simple answer really: BS
We should've had like last week where it was Stage 4 at night only? Though they saying they've burnt through to much reserves.
 
  • Like
Reactions: Yuu
They've been burning a loooot this last 2 weeks
So you think they're trying to save diesel overnight?
I suppose an attempt to save anything would be something respectful. Not sure anc deserve any savings though, nor that it would ever end up helping the country.
 
So you think they're trying to save diesel overnight?
I suppose an attempt to save anything would be something respectful. Not sure anc deserve any savings though, nor that it would ever end up helping the country.
Think they trying to save money? Or perhaps pump the water back up at night to flow during the day, who knows, the fact that the unplanned breakdowns has not dropped below 15GW in 3 months??
 
  • Like
Reactions: Yuu
Think they trying to save money? Or perhaps pump the water back up at night to flow during the day, who knows, the fact that the unplanned breakdowns has not dropped below 15GW in 3 months??