Glad to see this thread is still alive.
Update from my side. I had to pretty much arrange everything between everyone involved. If I hadn't then everything would have moved much slower. So my advice is to do what I did and get elected as a trustee and ask permission from Body Corp to act on their behalf in all matters related to Fibre. Body Corp were glad that I got involved because it is less work for them and they're not particularly tech savvy. For instance, we needed to sign a doc urgently but Body Corp was on holiday... thankfully, I could sign on their behalf. It just makes things so much easier.
W.r.t. the drop fibres. At first SADV said they wanted to do drop fibres after trenching and installing the buddy boxes in the communal areas. Then after they did that they said, no, they would rather wait until the backbone is completed (we were still waiting for the way leave from municipality). However I said lets go ahead and get the drop fibres installed so long, as there is no real reason to wait. However, it was hard work waiting for me... I had to pretty much arrange with the whole complex to be available on a certain date for contractors to enter their units. It was complicated, because the conduits that we used were old intercom conduits that daisy chained between units. So the contractors needed access to all units at once to pull the drop fibres through... I arranged with tenants to either be there on the date, or to leave their keys with me. I also had to look up who some of the flat owners were, get their agent details, and get keys from their agents because some flats were unoccupied... What a mission. Additionally, many of the tenants were quite difficult and I had a hard time keeping everyone happy. It's kind of like, most people want fibre and they are excited when they hear about the plans for it, but they don't realize how much time and effort goes into pulling something off like this, and they should be thanking you for taking initiative to bring fibre to the complex... Instead they would moan about leaving their keys, have strange people in their homes etc... I must say props to SADV and the contractors who they're using in my region, they were extremely professional, friendly and trustworthy.
Anyways so in the end it was successful and the contractors installed all the drop fibres on 14 December. Today they finished splicing the drop fibres into the one buddy box and tomorrow they will splice the second buddy box and cabinet.
I was also contacted today by the SADV project manager and he wanted me to sign a DFA LLA letter for permission to go-ahead with the backlink order, so that it can be placed in the queue. I'm not sure but I think this means the way leave was approved and they will commence trenching outside the complex as soon as they have a team available. Holding thumbs.
@Clayman How is the progress going on your end?
We're still waiting for municipality wayleaves here. So close....
So we had the meeting and the trustees are happy to proceed.
Seeing as it's a HOA we will need majority vote to proceed with the planning phases.
I will be most likely elected as a "champion" to handle all affairs and communicating with the key stakeholders during the implementation process.
We will most likely have feedback from the AGM which is to happen within the next few weeks.
where do you live ?
If i may ask ?
it seems like quite a schlep to get fibre in your area,
I do wonder how long it might have taken if you had just waited for the DFA to get installed eventually in your location.
I mean telkom been to us for a long time now, set up roadshows ect, but still no fibre in our MASSIVE complex.
next to bedford centre
@Sandman1 good luck, I've had great initial luck with contacting him, but sorta died out afterwards. Perhaps try their call centre if all else fails.
Updates from my side:
Wayleaves were sorted out, DFA busy sorting out the linkProgress!
Yes he replied first then nothing afterwards. I even send him an email but no reply yet.
My complex just needs DFA to break in now as the wayleave is completed. Then switch on the network to make it live I think.
Yeah to add a little non-update from my side, I also had good communications right in the start but now nothing from anyone at SADV. I had finally managed to get the trustees to all sign the SADV/DFA agreement, sent it in, had a few e-mails back and forth... and then nothing. I asked for feedback after a month and they informed me that they were trying to get our neighbouring complex to come on board as well and the lady would let me know in a week what was happening. That was a month ago, I have e-mailed asking for any sort of progress but nobody bothers replying. So basically over 2 months with literally nothing happening.
Funnily enough, while I have been trying to get some or other feedback, another fibre provider (I think[\i] it's Metro) has trenched and laid cable all down our street in the last 2 weeks and I'm just waiting for it to come up on my ISP's coverage map and if SADV still haven't bothered replying to me or doing anything I'll be going with someone else.
Rather disappointed to be honest, I liked the DFA/SADV offering and managed to convince the other trustees that it was the way to go (we had a proposal from another provider as well but I steered everyone towards the SADV offering) but once we signed the agreement to let them start with the groundwork it just stopped dead.
Im really confused now, afrihost shows connectivity in our complex, but SADV and vuma and openserve dont,
I thought all these fibre provideres can use anything else, so if your fibre is DFA, you can use vuma or TTconnect or anything you want
or does it not work that way at all?