So, I decided to expand the wiring in the garage where the Axpert is mounted. I wasn't happy with the layout, so I decided to put up a proper sub-DB. This is what it looks like:

Top row: Main switch DP breaker (fed from main DB), power indicator, breaker feeding changeover, then, earth leakage with 2 breakers for local plugs.
Bottom row: 4-way changeover switch wired to be used as bypass when inverter fails/being serviced, breaker from changeover (main breaker for dedicated section), power indicator, breaker feeding back to main DB, local dedicated plugs, local lights.
The Axpert is wired to and from the bottom of the changeover switch.
My inverter output neutral-earth bonding is done right at the Axpert's output terminals:

Comments welcome

Top row: Main switch DP breaker (fed from main DB), power indicator, breaker feeding changeover, then, earth leakage with 2 breakers for local plugs.
Bottom row: 4-way changeover switch wired to be used as bypass when inverter fails/being serviced, breaker from changeover (main breaker for dedicated section), power indicator, breaker feeding back to main DB, local dedicated plugs, local lights.
The Axpert is wired to and from the bottom of the changeover switch.
My inverter output neutral-earth bonding is done right at the Axpert's output terminals:

Comments welcome