Tabac
Honorary Master
50mm cable ? Fckit ...As per the training manual, up to 16 can be paralleled. All batteries must be connected in parallel (minimum cable size 50mm diameter), and the Grid and Load of each inverter must be in parallel. Aux/Gen cannot be paralleled, in fact the use of the AUX / Smart Load is discouraged, this is the only caveat that I am aware of. Oh yes, and each inverter needs a separate data logger.





